Basic Info.
Type
Cutter Suction Dredger
After-sales Service
15 Years
Application
Sand/Mud/Clay Dredging
Service
Free Assembly, Training, Testing
Reliability
Manufactured for Fortune 500 Companies
Transport Package
Bulk Carrier
Specification
6inch, 8inch 10inch, 12inch, etc.
Product Description
I. Products Description1. Cutter Suction Dredger of steel construction, the non self-propelled, dismountable type, is able to berth and dredge at any waters both in the coastal area and inland rivers. The dredger can be used to excavate and transport cohesive sediment below the class III specified in code for dredging engineering construction technique issued by Ministry of Water Resources(MWR) of P. R. China. 2. It's hull consists of a main pontoon and two side pontoons. Is to be easy to dismantle or mount for transportation by road, rail or water, and is to be easy to reassemble at project site. The engines and dredge pump are located in the center pontoon, the 2 side pontoons serve as fuel bunkers, ballast tanks and store. 3. The dredger is powered by diesel engines. The main diesel engine is to drive the dredge pump and the auxiliary engine is to drive hydraulic system, including cutter, swing and ladder winches, anchor winches, and the spud rams etc. 4. The spacious control cabin is ergonomically designed with 360 degree view. All the operation buttons, swifts, indicators, gauges are equipped on the control desk. Only two operators can control all the dredger in the operation room. 5. The dredger is painted by 4 layers of marine paint to protect from the corrosion. The ZINC anode can be used to give better anti-corrosion function.II. Technical Specifications Max. Dredging Capacity | Dredging Depth | Suction Pipe Dia. | Discharge Pipe Dia. | Engine Power |
15-metre Cutter Suction Dredger Specs and Price | |
ITEM | Parameter | | |
Total Length | 35m | | |
HullWidth | 25.0m | | |
Hull Depth | 1.8m | | |
Hull Width | 6.0m | | |
Main Engine | 540KW | JICHAI POWER | |
Auxiliary Engine | 24KW | WEICHAI POWER | |
Cutterhead Dia | 1.5m | | |
Pump DischargeDia | 300mm | SHIJIAZHUANG | |
Pump Suction Dia | 350mm | | |
Water Flow | 2000m³/h | | |
Discharge Distance | 1500m | | |
Working Weight | 130Ton | | |
Spud Pile | 450mm, two pieces, 18meters/piece | | |
Hydraulic Winch | 3 pieces | | |
Navigation Ability | No | | |
Operation System | | | |
Spare Part | Diesel engine tools, oil seal, electric welder and so on, 70 items. | | |
III. Main Features1.Quality ControlThe main components of cutter suction dredgers are all well-known brands at home and abroad, like Cummins, Weichai and Schneider and so on, which can ensure the efficiency and working life.2.Modular StructureThe side pontoons and main pontoon are connected by high strength bolts. With this combined design, this equipment can be ensured with module structure and be transported and assembled easily.3.Environmental Protection ConceptThe cabin adopts new environmental protection material, which has the advantages of sound insulation and heat preservation and can effectively improve the working environment.4.Short Delivery TimeWe will prepare various main components of dredgers in the workshop, like diesel engine, dredging pump and cutter head, which can greatly shorten delivery time.IV. PACKING AND SHIPPINGWay of Packing 1. FLC&LCL Export standard container 20/40 GP. 2. Steel support & iron sheet sea- worthy package. 3. Load: Export software scientific loading workTransportation 1. By sea freight. 2. MSK/MSC/APL/EMC/WANHAI/KLINE3. Air delivery services4. We will remind you before boat arrives.V. After-sales service: 1. Free dredger consulting and product drawings 2.Customize the dredging machine according to the customer's actual dredging requirements 3. Site visit and factory visit are provided 4. Arrange 2-3 senior engineers and technicians to enter the work site within 36 hours 5. Free professional assembly, training and operation to ensure a smooth operation of the dredger 6. 1 year warranty, lifetime technical support 7. Sign after-sales service agreement with customer 8. Spare parts are supplied at a discounted price 9. Site availability 10. Responsible sales team, design team, manufacturing team to provide customers with the best service 24/7. VI.About Our FactoryVII. FAQIn order to provide you with efficient & suitable quotation and assistance for you, could you kindly tell me the following information: 1) Output capacity(m3/h) 2) Max. Dredging depth(m) 3) Discharge distance(m) If you have any questions about our products or company, please let us know, we will try our best to make you satisfied.
Address:
Huhai Building Center, Jingxiu District, Baoding City, Hebei
Business Type:
Trading Company
Business Range:
Construction & Decoration, Industrial Equipment & Components, Light Industry & Daily Use, Manufacturing & Processing Machinery
Management System Certification:
ISO 9001
Company Introduction:
Baoding Heb Construction Engineering Company in the industry took the lead through the quality, environment and occupational health, Management system certification. It is member unit of China′s steel Structure Association, China Construction Metal Structure Association. It got the Chinese steel structure stunt Manufacturing Enterprise qualification certificate in 2015, was awarded the leading enterprise title of "Construction Steel Products" by the Hebei Province construction department.
It undertook a number of projects and got the awards of "Luban Award", "China Steel Structure Gold Award", "Hebei Province High-quality Engineering.
Baoding Heb Construction Engineering Company uphold and insisted on the enterprise spirit of being a thoughtful enterprise. Our mission is always quality, integrity and experience. Our goal is to provide our customers with excellent customer experience and lasting metal structure. Start as a customer, leave as family.
We have 4 steel structure production lines, equipped with CNC intersecting wire cutting machine, CNC plane drilling, electroslag welding, hydraulic presses and other processing equipment more than 300 sets of units, with an annual capacity of 500, 000 ton steel structure.